Efficient drainage behind MSE walls is essential to isolate the reinforced soil structure from possible water infiltrations and thus preserve the geotechnical characteristics of the backfill material. Indeed, 70% of retaining walls failures are due to absent or deficient drainage system.

The DRAINTUBE® FTF geocomposite drains the incoming groundwater at the interface between the reinforced soil structure and the infrastructure. It has a high and stable over time drainage capacity, even under heavy loads. This allows it to be used behind important MSE wall heights.

Depending on the project (height of the wall, slope, etc.), the geocomposite can be installed in two ways:

  • Installation from the toe of the slope
  • Installation from the top of the slope

DRAINTUBE® FTF replaces the traditional granular drainage layer and the filtration geotextiles with a single product easy to install.

Benefits

  • Efficient Drainage and Filtration of the groundwater even under high loads
  • Hydraulic protection of the reinforced soil structure
  • Proven efficiency
  • Reduction of the construction time
  • Easy installation with a single product to unroll
  • Cost-effective and environmentally friendly solution as it replaces granular layers

Features

Drainage Drainage
Filtration Filtration
Mechanical protection Mechanical protection

Characteristics

  • Multi-linear drainage geocomposite (ASTM D4439)
  • Perforated mini-pipes made of polypropylene
  • 3 diameters of perforated mini-pipes: 16 mm, 20 mm and 25 mm
  • 4 spacing options between the mini-pipes: 2 m, 1 m, 1/2 m and 1/4 m (80’’, 40’’, 20’’, 10’’)
  • Standard roll size: 3.98 m x 75 m (13.1’ x 246’)


Projects completed with DRAINTUBE FTF

Drainage behind Mechanically Stabilized Earth (MSE) wall

Drainage behind Mechanically Stabilized Earth (MSE) wall

[Public works]

South Frazer Perimeter Road, British-Columbia
25 000 m2 (250 000 sq ft)
DRAINTUBE® FTF drainage geocomposite is used for the drainage behind MSE wall in replacement of the washed clean stone layer and the two filtration geotextilesle. The geocomposite offers a stable long-term drainage capacity even under high loads.  The ease of installation of DRAINTUBE® optimizes construction time and increases safety on site.